Home » Archive for November, 2010

Painting the turnstiles on Tower Bridge

Specialist painting contractors are now restoring the South West Turnstile and the fencing surrounding the Control Cabin on the South Tower. The new paintwork, which has a life expectancy of 25 years, is essential to protect the steelwork and preserve the bridge for future generations.    Read More →

Scaffolding the Bascules nears completion

Work on erecting the scaffolding around the bascules nears completion.  Specialist painting contractors have now started to restore the South West Turnstile and the fencing surrounding the Control Cabin on the South Tower. The new paintwork, which has a life expectancy of 25 years, is essential to protect the steelwork and preserve the bridge for future generations. Tower Bridge as seen from outside... 

Painting the Tower Bridge Turnstiles

Specialist painting contractors have now started to restore the South East Turnstile and the fencing surrounding the Control Cabin on the South Tower. The new paintwork, which has a life expectancy of 25 years, is essential to protect the steelwork and preserve the bridge for future generations. Applying the aluminium undercoat to the South East Turnstile on the South Tower of Tower Bridge Painting... 

Scaffolding the Tower Bridge Bascules

Work is now underway on erecting the scaffolding around the Tower Bridge bascules, the ‘see-saw’ elements of the road. This means that there will be no Bridge Lifts for vessels taking place until the end of March when the work is due to be completed. Images taken: 04/11/2010 The Bascules (looking north) Scaffolding being erected under the North Bascule Scaffolder Erecting the scaffolding... 

Abseilers under the Tower Bridge Walkways

A short video shot during one of the night-time bridge closures, showing abseilers working under the Walkways and the transfer of the ALPS Space Frame Platforms (cradles) from the East to the West Walkway.    Read More →

At night on Tower Bridge

A short video showing the two ALPS Space Frame Platforms under the West Walkway, specialist contractors moving the mobile elevating work platforms (speeded up) across Tower Bridge, painting under the arches, lowering one of the ALPS Space Frame Platforms, abseiler removing the defective paint work from a Corbel on the South Tower, scaffolding being dismantled  between the two Walkways and one of... 

The Tower Bridge Bascules

During the night-time bridge closures, the bascules were raised to facilitate the painting of areas inaccessible when the Bridge is in its down position. With this work now completed, scaffolding will be erected around the underside of the bascules from 2 November, this means that there will be no Bridge Lifts for vessels taking place until the end of March when the work is due to be completed.  Read More →