
The newly painted South West Suspension Chain

The Envirowraps cover the scaffolding on the short section of the South East Suspension Chain, which adjoins the Abutment Arch

A view looking north showing the South Tower and the scaffoldingon the east side
Watch a video of the Envirowraps being applied to the scaffolding

Envriowraps being applied to the scaffolding

The Envirowrap sheeting is cut around the protruding scaffolding and taped into position, before being bonded to form a seamless enclosure

Shrink-wrap adhesive tape being applied to the Envirowraps

The Envirowraps are blasted with a propane flame gun shrinking and tightening wherever the flame passes over it

The Envirowraps being blasted with a propane flame gun with the South Tower in the background

The South Tower and the scaffolding surrounding the South East Suspension Chain

A view of Tower Bridge from the river bank outside the Tower of London












