Home » Posts tagged with "bridge closure"
At night on Tower Bridge
A short video showing the two ALPS Space Frame Platforms under the West Walkway, specialist contractors moving the mobile elevating work platforms (speeded up) across Tower Bridge, painting under the arches, lowering one of the ALPS Space Frame Platforms, abseiler removing the defective paint work from a Corbel on the South Tower, scaffolding being dismantled between the two Walkways and one of...
Tower Bridge Bascule nosings
During the night-time road closures, specialist painting contractors removed the defective Top Coat and repainted the Bascule nosings with modified epoxy paint.
Read More →

