Side Access Platforms
42 metres above the River Thames, specailist contractors have erected Side Access Platforms to each side of the East Walkway.
42 metres above the River Thames, specailist contractors have erected Side Access Platforms to each side of the East Walkway.
Images by Harris Digital Productions
Harris Digital Productions was commissioned by the City of London to record the restoration and repainting of Tower Bridge. This website is dedicated to the restoration work which took place during 2008-2011.
Harris Digital Productions was commissioned by the City of London to record the restoration and repainting of Tower Bridge. This website is dedicated to the restoration work which took place during 2008-2011.